Initial Water Treatment for New Onground and Inground pools

Day 1

1. As soon as your water is circulating and your filter is clean, suspend a double layered leg of panty hose filled with (S/M Pool : 500gm , L/XL Pool : 1 Kg.) Stabilizer from the ladder and leave it there until dissolved.

2. At least 2 hours after Step 1, add (S/M Pool : 250gm , L/XL Pool : 500 gm.) of HTH Sock-it Unstabilized Granular Chlorine to the pool water.


Day2

3. Begin daily chlorination by:

(a) If you have an Automatic Chlorinator fill it with 5-7 stabilized chlorine pucks. Set the control valve to medium.

(b) If you have a Floating Chlorinator fill it with stabilized chlorine pucks or mini tabs. Set the control vents to medium.

(c) If you are using stabilized chlorine granules add a daily dosage of 60gm (1/4) cup.

48 hours after Step 3 take a sample of water to Pioneer Family Pools for testing (500 ml.)

Never add Water To Chemical - add Chemical to Water.


Pool chemicals must be handled with care. Always read and follow all label directions.

 
We have detected that your web browser may not support/display all the features on this website properly. Please use the lastest Microsoft or Netscape product.